Our quality assurance saved the project $100,000 in cost overruns.
Overview
Smith College's new library footprint needed to match the old library's exactly.
Solution
- Completed as-built project condition survey.
- Provided measurements of up to a 100th of a foot of tolerance for laying out the new library.
- Determined different elevations for the different library floors so that everything was merged.
- Provided high accuracy measurements for project architects so that they could make appropriate design adjustments.
- Worked closely with project designers throughout.
- Are continuing to follow up on project construction layout.
Outcome
Our team's precise calculations, quality assurance and problem solving work saved the project $100,000 in cost overruns.