Smith College Library

Smith College Library photo

Our quality assurance saved the project $100,000 in cost overruns.

Overview

Smith College's new library footprint needed to match the old library's exactly. 

Solution

  • Completed as-built project condition survey.
  • Provided measurements of up to a 100th of a foot of tolerance for laying out the new library.
  • Determined different elevations for the different library floors so that everything was merged.
  • Provided high accuracy measurements for project architects so that they could make appropriate design adjustments.
  • Worked closely with project designers throughout.
  • Are continuing to follow up on project construction layout.

Outcome

Our team's precise calculations, quality assurance and problem solving work saved the project $100,000 in cost overruns.

In This Section